This form must be completed by any exhibitor who plans to use an independent contractor other than those appointed by The Buildings Show (Freeman, Encore A/V, ShowTech Power & Lighting, The International Centre).

EAC’s cannot perform the work of exclusive contractors as listed below.

Deadline for submission and the EAC’s certificate of insurance is March 6, 2023.


THIS FORM MUST BE SUBMITTED BY THE EXHIBITOR AND SIGNED BY BOTH THE EXHIBITOR AND EAC

DEADLINE: MARCH 6, 2023

EXHIBITOR APPOINTED CONTRACTOR (EAC) # 1

EAC #1 Address*
Type of service to be provided*
Upload EAC # 1 Certificate of Insurance*
I will upload my Certificate of Insurance to https://www.exhibitorinsurance.com/pub/srch/?m=ul&e=TBSS2022
Upload EAC #1 Form 1000
No File Chosen
File uploads may not work on some mobile devices.

EXHIBITOR APPOINTED CONTRACTOR (EAC) # 2

If you have more than one contractor please fill out this pop-down section below.

EAC #2 Address*
Type of service to be provided by EAC #2*
Upload EAC # 2 Certificate of Insurance*
I will upload my Certificate of Insurance to https://www.exhibitorinsurance.com/pub/srch/?m=ul&e=TBSS2022
Upload EAC #2 Form 1000
No File Chosen
File uploads may not work on some mobile devices.

EXHIBITOR APPOINTED CONTRACTOR (EAC) # 3

If you have more than one contractor please fill out this pop-down section below.

EAC #3 Address*
Type of service to be provided by EAC #3*
Upload EAC # 3 Certificate of Insurance *
I will upload my Certificate of Insurance to https://www.exhibitorinsurance.com/pub/srch/?m=ul&e=TBSS2022
Upload EAC #3 Form 1000
No File Chosen
File uploads may not work on some mobile devices.

MANDATORY EAC REQUIREMENTS AND REGULATIONS

  • EAC’s are NOT ALLOWED to perform or provide services for the following areas: Drayage (Freeman), Fork and Genie Lift Operations (Freeman & ShowTech Power & Lighting), Overhead Rigging, Electrical Services, Plumbing and Mechanical Services (ShowTech Power & Lighting), Telecommunications Services (Encore AV), Booth Cleaning (Caldas Building Services) and Catering (F&B) (The International Centre).
  • The EAC covenants and agrees to indemnify and hold harmless Informa Canada Inc. and The International Centre (TIC) from and against all claims, demands, charges, losses or damages arising or alleged to arise directly, indirectly or incidentally by reason of any act, omission or operations of the contractor, its officers, employees, agents or anyone for whom the contractor is legally responsible.
  • The EAC acknowledges that its equipment and property at TIC is not protected by insurance against fire, theft, vandalism, etc. by TIC and the protection of such is the responsibility of the contractor.
  • EAC’s must submit a Certificate of Insurance that meets the following criteria:
    • Comprehensive liability insurance shall provide a minimum limit of liability of five million dollars ($5,000,000) for bodily injury and/or property damage in any one occurrence;
    • Issued by an insurance company licensed to transact business in North America;
    • Provide that it will not be cancelled or materially altered prior to the termination of the Occupancy Period (April 3 – 5, 2023 inclusive);
    • Lists the following as additional insured:
      • Informa Canada Inc. (20 Eglinton Avenue West, Suite 1200, PO Box 2055, Toronto, ON M4R 1K8)
      • The International Centre (6900 Airport Road, Mississauga, ON L4V 1E8)
  • EAC’s are only permitted on the Show floor without a valid tradeshow badge during move-in hours. If the EAC duties require them to service an exhibitor’s booth during show days, the exhibitor must provide the EAC with an official exhibitor badge.
  • EAC's must confine operations within the exhibit area of the exhibitor. Aisles, other exhibit spaces and vacant areas may not be used as work or storage areas.
  • EAC's are not permitted to solicit and sell their business to any exhibitors associated with ROOFTech at any time (pre-show or onsite). They will be immediately removed from the premise if they are found doing so. 
  • The exhibitor is responsible for providing the EAC with any necessary information pertaining to the exhibit hall (i.e. utilities, order forms, dates, hours, shipping information, booth regulations, etc.) via the online Exhibitor Manual.

Authorization

Confirmation of Authorization*
Responsibility for EACs *
Use your mouse or finger to draw your signature above
Date/Time*
:  
Powered by Formstack Create your own form